Located in Binningup. 80 MGD Capacity: 80,000 AF/Y. Total Capital Cost: 1.27 billion. Purpose: Base load core supply. Commenced operation in June ‘13. Wind / Solar/ Wave Power as energy offset. Status: Phase 1 & 2: operating. Courtesy of Water Corporation.